Design Review Checklist

Based on Sections 10 and 11 of the guide.

Readiness checks

  • Interface definition is complete
  • Electrical limits are defined and sourced where required
  • Every rating/requirement is traced to a source document + revision, with verification status marked (verified / assumed / example / TBD)
  • Assumptions are explicitly listed with the risk if each is wrong
  • Current derating and wire-gauge compatibility are reviewed
  • Locking, strain relief, and backshell strategy are defined
  • Sealing and unmated protection are addressed
  • Keying and mis-mate prevention are addressed
  • Load-break / hot-plug / mate-under-power status recorded from the datasheet for every power-carrying interface (never assumed)
  • Tooling and assembly process are defined
  • Workmanship/acceptance standard identified (e.g. IPC/WHMA-A-620 or the program/customer equivalent)
  • Documentation package exists (BOM, pinout, cable drawing, ICD)

Red-flag scan

Red flagStatusNotes
Pin-count-only selection avoidedTBD
Power and signal segregation reviewedTBD
Backshells included where neededTBD
Tooling identifiedTBD
Dust caps / dummy plugs included where neededTBD
Torque specs documentedTBD
Wire seal sizing checkedTBD
Mating connector included in BOMTBD
Load-break / mate-under-power status verified, not assumedTBD
Ratings traced to manufacturer/standard documents, not distributor listingsTBD
Shield strategy documented with rationale (not a default)TBD
Touch safety when unmated addressed for power pathsTBD
Fusing / fault current / inrush documented for power pathsTBD
Service access reviewedTBD
Cable labels / identification definedTBD

Risk summary

Connector / interfaceRiskSeverity (H/M/L)Corrective action
TBDTBDTBDTBD
TBDTBDTBDTBD